Mason
Work with brick, stone, and concrete to build facades and walkways.
Lays tile conduit that insulates and protects water or steampipes: Lays runners in previously excavated trench and checks slope with carpenter’s level, digging out or filling in with loose earth. Splits drain tile longitudinally and places halved tiles on runners, fitting spigot end of each half tile into bell end of adjacent tile. Mixes mortar of cement, oakum, and water, and applies it to edges of top half of tiles after PIPE FITTER has laid water or steampipes in bottom tiles already in position. Places top half sections on corresponding bottom half tiles and seals joints between sections by forcing mortar into bell end of tiles [PIPE LAYER].
Trustworthy: You are known for your personal integrity and honesty.
Independent: You enjoy flying solo and doing things your own way.
Calm Under Pressure: You keep your cool when dealing with highly stressful situations.
Nationally: $22,000 – $69,000
Main education level: High School
source: US Dept of Labor